KMH Engineering Inc.

What's New

Please select an article below to learn more about new happenings at KMH consulting engineering firm:

Date:

Title:

Aug. 20, 2009

CSA Certifies KMH's Panel Shop

Jun. 8, 2009

KMH Provides Backup Control System to Effluent Plant Level Controls

Apr. 30, 2009

KMH Provides E&I Designs for Balance of Plant of New Cogeneration Plant

Mar. 21, 2009

KMH Provides Multipurpose Vessel (MPV) Controls Upgrade

Mar. 18, 2009

KMH Provides E&I and Automation Design for a New Turpentine Storage Tank

Sep. 12, 2008

KMH Provides E&I Capital Cost Estimate for New Steam Condensing Turbine

Sep. 10, 2008

KMH Provides Design for 4160V Power to Tailings Pond

Aug. 30, 2008   

KMH Provides Detailed Electrical Engineering for the Replacement of PCB Filled Unit Substation Transformers

Aug. 15, 2008

KMH Provides Rotary Furnace BMS and DCS Upgrade

Jul. 29, 2008  

KMH Provides E&I Automation Design for Paper Mill Cooked Starch System

Jun. 20, 2008

KMH Completes PLC Upgrade to Relay Based Slab Caster Cutoff Torches

Jun. 16, 2008

KMH Provides Detailed E&I Design and Automation Services for Turbo Blower Controls Upgrade

Jun. 1, 2008   

KMH Provides E&I Designs and Automation for a GE-Zenon Water Filtration System

May 26, 2008

KMH Awarded E&I Design Contract for Zellstoff Celgar Green Energy Project

May. 9, 2008

KMH Provides Detailed Design and Automation Services for a Paper Machine PLC Replacement

Apr. 1, 2008

KMH Opens New Sudbury Branch Office

Mar. 11, 2008

KMH Provides Design and Control Equipment for Metso PowerDry Systems

Feb. 29, 2008  

KMH Provides Transformer Yard Design

Feb. 18, 2008  

KMH Provides E&I and Automation Design for Kraft EOP Stage

Nov. 1, 2007

KMH Supplies Flamestar BMS System for Domtar

Oct. 1, 2007 

KMH Completes Substation Relocation Design for Brookfield Power Gartshore G.S. 

Sep. 9, 2007

KMH Provides Bale Line PLC Replacement

May. 1, 2007

KMH Completes 45 MW Steam Turbine Generator Feasibility Study Work for Terrace Bay Pulp 

Jan. 1, 2007

KMH Announces Engineered Control Panel Fabrication Shop

Oct. 1, 2006

KMH Supplies Fuelstar Fuel Inventory Monitoring System for First Nations Communities

Oct. 1, 2006

KMH Provides Complete Mini-Hydro Turbine Power and Control System

Sept. 1, 2006

KMH Completes Prince Wind Farm Design Projects

Nov. 4, 2005

KMH Designs and Commissions Coke Oven Gas Burner Management System for Algoma Steel

Aug. 1, 2005

KMH To Complete Sootblower Controls Optimization for Ontario Power Generation - Atikokan G.S.

Apr. 25, 2005

KMH To Complete Substation Upgrade Design for Brookfield Power Andrews G.S.

Apr. 1, 2005

KMH Completes Arc Flash Hazard Analysis for Area Pulp and Paper Mill

Jan. 1, 2005

KMH Completes Black Liquor Recovery Boiler Advanced Controls Implementation

May 10, 2004

KMH to Provide Integration Services for DNCG Collection and Incineration System

Mar. 1, 2004

KMH To Develop Optimized Power Boiler Combustion Control Strategy

Dec. 30, 2003

OPG Atikokan Upgrades Attemperation Controls

Dec. 15, 2003

KMH Completes Detailed Interlocking Audits for PM1 and PM3 at Portucel in Portugal

Nov. 4, 2003

KMH is Designated as a Siemens Solution Provider

Oct. 21, 2003

KMH Provides E&I Design for New Calender on Cascades Thunder Bay PM8

Oct. 21, 2003

KMH Provides E&I Design for Controls Upgrade to Softwood Refiners at Cascades Thunder Bay

May 30, 2003

KMH Implements Recovery Boiler Sootblower Controls Upgrade in Terrace Bay

Apr. 1, 2003

John Boegh, P. Eng. Boiler Process Expert Joins KMH

Jan. 21, 2003

KMH Provides Electrical Design for Upgrade of 115 kV Incoming Relay Protection

Dec. 1, 2002

KMH Provides Complete Design for Replacement of Two Obsolete Unit Substations

Apr. 2, 2002

KMH to Complete Electrical Energy Audit of Paper Mill

June 1, 2001

ABGS and KMH Team Up for Balance of Plant Controls Upgrade in Thunder Bay

Feb. 1, 2001

Orion CEM and KMH Team Up for $5.8M Recovery Area Controls Upgrade in Thunder Bay

If you have any questions or comments, please do not hesitate to contact us